Gough St, Birmingham

540nr Student Apartments in Birmingham City Centre

Description of works:

Deep excavations
RC raft slabs, walls, columns
GF slabs
2nr Crane Bases
Sewer connections and internal drainage
4-6m high retaining walls
Significant levels difference on site—9m top to bottom!

Queens Rd, Nottingham

The Barnum, Nottingham – Flagship 10-storey residential development — 348nr BTR apartments

Description of works:

Site clearance and Pilling Matt
Pile Treatment
RC Pile Caps and Ground Beams
RC Walls & all associated formwork
Drainage including 2nr attenuation tanks and S106 connection
900mm combined sewer diversion
RC Ground Floor Slab
External Finishing Works
S278 works

Sherriffs Gate, Worcester

213nr Apartment Development

Description of works:

Site clearance and Pilling Matt
Pile Treatment
RC Pile Caps and Ground Beams
RC Walls & all associated formwork
Drainage including deep attenuation tank and S106 connection
RC Ground Floor Slab
External Finishing Works

Gunsmith House, Birmingham

85nr new BTR apartments in the Gun Quarter

Description of works:

Site clearance and Pilling Matt
Pile Cropping
RC Pile Caps, Beams, GF Slab
RC Walls & all associated formwork
Drainage including deep attenuation tank and S106 connection
Basement Construction
External Finishing Works

 

The Square, Birmingham

Broad St, Birmingham – 35 storey development in the heart of Birmingham

Description of works:

Soft and hard landcaping
S106 connection
Permeable paving
Aluminium edging
Resin bound gravel
Tarmacadam
S278 works

Burcot Lane, Bromsgrove

18 new build houses & 47-bed apartment block

Description of works:

Cut & Fill
Ground beams
Block & Beam flooring
Substructure brickwork
Adoptable road construction
Plot drainage
Adoptable STW drainage
Clean cover system to landscaped areas
Permeable paving

Westcott Rise, Pershore

Burcot Lane, Bromsgrove – 18 new build houses & 47-bed apartment block

Description of works:

Cut & Fill
Ground beams
Block & Beam flooring
Substructure brickwork
Adoptable road construction
Plot drainage
Adoptable STW drainage
Clean cover system to landscaped areas
Permeable paving

Bristol Street Birmingham Groundworks

Bristol St, Birmingham

Flagship project comprising 278 residential apartments across 15- and 5-storey frames

Description of works:

Site clearance and Pilling Matt
Pile Treatment
RC Pile Caps, Beams, GF Slab
Crane bases x 2
Drainage including 4nr attenuation tanks